Login
Reset password
Reset password

If you have forgotten your password, please, enter your e-mail address, and all information will be sent to you.

Login
Technical support message
Авторизуйтесь, чтобы отправить сообщение в техническую поддержку
Сообщить об ошибке
Авторизуйтесь, чтобы отправить сообщение об ошибке
Размер:
AAA
Цвет: CCC
Изображения Вкл.Выкл.
Обычная версия сайта
11.07.2018, 10:54

The finishing works in the new building of the Orthodox School will be completed by September 1

It is supposed to have the main and secondary units of the school to the 11th grade.

(KZN.RU, July 11). Feofan, the Metropolitan of Kazan and Tatarstan, urged to finish all the construction and finishing work in the Orthodox School of Kazan by September 1. He visited the construction site and inspected the progress of the construction of the new school building. The new building is designed for 150 students and has an area of about 3800 square meters. It is planned to place the main and secondary units of the school to the 11th grade. In addition to classes, the school has a gym and a library. The head of the contract organization assured that all the works will be completed on time and with proper quality.

The building is a historic copy of the clergy's house, which was built on the territory of the temple in 1840 and was destroyed several decades ago. The construction began in November 2017. The works were complicated by ground waters close to the ground and an underground river flowing directly under the construction site. In addition, networks and communications were transferred. The installation of the heating system was also completed before the start of the heating season.

Today, builders continue to work on the installation of networks and interior decoration of premises. There is a preparation for laying linoleum floors, painting walls and ceilings. Dismantling works of the walls are being completed to connect the new building with the existing building of the school. Soon, the landscaping and the connection of the section of the building under construction with the territory of the Advent Church will begin. Builders will also tint the facades in the color of the first building of the school, set the cornices, perform the decoration of the pediment at the central entrance in the same style with the building of the Advent Church, reports the press service of the Kazan Diocese.

All news

The finishing works in the new building of the Orthodox School will be completed by September 1

<p> (KZN.RU, July 11). Feofan, the Metropolitan of Kazan and Tatarstan, urged to finish all the construction and finishing work in the Orthodox School of Kazan by September 1. He visited the construction site and inspected the progress of the construction of the new school building. The new building is designed for 150 students and has an area of about 3800 square meters. It is planned to place the main and secondary units of the school to the 11th grade. In addition to classes, the school has a gym and a library. The head of the contract organization assured that all the works will be completed on time and with proper quality. </p> <p> </p> <p> The building is a historic copy of the clergy's house, which was built on the territory of the temple in 1840 and was destroyed several decades ago. The construction began in November 2017. The works were complicated by ground waters close to the ground and an underground river flowing directly under the construction site. In addition, networks and communications were transferred. The installation of the heating system was also completed before the start of the heating season. </p> <p> </p> <p> Today, builders continue to work on the installation of networks and interior decoration of premises. There is a preparation for laying linoleum floors, painting walls and ceilings. Dismantling works of the walls are being completed to connect the new building with the existing building of the school. Soon, the landscaping and the connection of the section of the building under construction with the territory of the Advent Church will begin. Builders will also tint the facades in the color of the first building of the school, set the cornices, perform the decoration of the pediment at the central entrance in the same style with the building of the Advent Church, reports the press service of the Kazan Diocese. </p>