Login
Reset password
Reset password

If you have forgotten your password, please, enter your e-mail address, and all information will be sent to you.

Login
Technical support message
Авторизуйтесь, чтобы отправить сообщение в техническую поддержку
Сообщить об ошибке
Авторизуйтесь, чтобы отправить сообщение об ошибке
Размер:
AAA
Цвет: CCC
Изображения Вкл.Выкл.
Обычная версия сайта
13.12.2021, 13:27

I.Metshin: “We have renovated over 63% of the housing stock of Kazan for ten years”

The overhaul program for next year includes 171 apartment buildings, 3,493 houses have already been renovated in the city.

In Kazan, 293 apartment buildings have been renovated this year: the roof and fronts have been refurbished, utilities and elevators have been replaced. The scope of work performed exceeds 98 %.

“For 10 years we have come a long way, today more than 63% of the housing stock of Kazan has been renovated, - the head of the city said. – The houses should be maintained properly. But for decades to come, the housing stock including utilities, elevators, roofs, has been brought into a good working condition”. For reference, 3,493 apartment buildings have already been renovated in the city under the program.

In 2021, 144 roofs and 103 fronts have been refurbished, 170 elevators have been replaced

Under the three-year overhaul program of apartment buildings in Kazan, it is planned to overhaul 740 buildings for more than 7 billion rubles. This year, 293 of them have been renovated, 171 houses have been included in the next year's program, Dmitry Anisimov, chair of the Housing and Utilities Committee of the Executive Committee of the city, reported.

The housing overhaul program follows the Our Yard improvement program - this year residents of 22 houses were able to evaluate the results of both programs.

This year, 144 roofs and 103 fronts have been refurbished, the heating networks have been replaced in 122 houses, 170 new elevators have been installed in 59 houses, weather control units are also installed in houses according to the program, entrances are being replaced and other work is being carried out.

“After overhaul, acceptance committees were carried for 266 out of 293 houses”, -D.Anisimov said. According to him, to date, overhaul was completed by 98.31%.

The overhaul of the apartment buildings is not limited to the list of works provided in the program, D.Anisimov noted. Additional work is being carried out at the expense of other programs and sources. Thus, the yards are being equipped with enclosures for separate waste collection – in 2020-2021, 317 trash enclosures were equipped, 155 of them by property management companies, 162 under the Our Yard program. The property management companies also introduce innovative technologies, such as a smart intercom, an automatic door opening system, anti-spam mailboxes and others. As an example, D.Anisimov cited the house No.2 on Volgogradskaya Street, where the management company installed a charging station for e-vehicles.

Maintenance work: the roofs of 52 houses and the fronts of 169 houses were refurbished

D.Anisimov also reported on the progress of maintenance work. Every year, the property management companies form lists of scheduled preventive maintenance.

“These works are a great help in carrying out renovation works. The spring and autumn inspections of residential building is taking into account, as well as the condition of utilities, roofs, fronts, entrances and regulations of supervisory authorities”, - explained the chair of the Housing and Utilities Committee.

This year, as part of the scheduled preventive maintenance, the roofs of 52 houses were refurbished, the fronts of 169 houses were repaired and the heating networks in 48 houses were repaired.

 

Photo report
Business Monday, 13.12.2021
Video report
13.12.2021 12:50
In 2021, overhaul was carried out in 293 apartment buildings in Kazan
All news

I.Metshin: “We have renovated over 63% of the housing stock of Kazan for ten years”

<p> In Kazan, 293 apartment buildings have been renovated this year: the roof and fronts have been refurbished, utilities and elevators have been replaced. The scope of work performed exceeds 98 %. </p> <p> “For 10 years we have come a long way, today more than 63% of the housing stock of Kazan has been renovated, - the head of the city said. – The houses should be maintained properly. But for decades to come, the housing stock including utilities, elevators, roofs, has been brought into a good working condition”. For reference, 3,493 apartment buildings have already been renovated in the city under the program. </p> <p> <b>In 2021, 144 roofs and 103 fronts have been refurbished, 170 elevators have been replaced</b> </p> <p> Under the three-year overhaul program of apartment buildings in Kazan, it is planned to overhaul 740 buildings for more than 7 billion rubles. This year, 293 of them have been renovated, 171 houses have been included in the next year's program, Dmitry Anisimov, chair of the Housing and Utilities Committee of the Executive Committee of the city, reported. </p> <p> The housing overhaul program follows the Our Yard improvement program - this year residents of 22 houses were able to evaluate the results of both programs. </p> <p> This year, 144 roofs and 103 fronts have been refurbished, the heating networks have been replaced in 122 houses, 170 new elevators have been installed in 59 houses, weather control units are also installed in houses according to the program, entrances are being replaced and other work is being carried out. </p> <p> “After overhaul, acceptance committees were carried for 266 out of 293 houses”, -D.Anisimov said. According to him, to date, overhaul was completed by 98.31%. </p> <p> The overhaul of the apartment buildings is not limited to the list of works provided in the program, D.Anisimov noted. Additional work is being carried out at the expense of other programs and sources. Thus, the yards are being equipped with enclosures for separate waste collection – in 2020-2021, 317 trash enclosures were equipped, 155 of them by property management companies, 162 under the Our Yard program. The property management companies also introduce innovative technologies, such as a smart intercom, an automatic door opening system, anti-spam mailboxes and others. As an example, D.Anisimov cited the house No.2 on Volgogradskaya Street, where the management company installed a charging station for e-vehicles. </p> <p> <b>Maintenance work: the roofs of 52 houses and the fronts of 169 houses were refurbished </b> </p> <p> D.Anisimov also reported on the progress of maintenance work. Every year, the property management companies form lists of scheduled preventive maintenance. </p> <p> “These works are a great help in carrying out renovation works. The spring and autumn inspections of residential building is taking into account, as well as the condition of utilities, roofs, fronts, entrances and regulations of supervisory authorities”, - explained the chair of the Housing and Utilities Committee. </p> <p> This year, as part of the scheduled preventive maintenance, the roofs of 52 houses were refurbished, the fronts of 169 houses were repaired and the heating networks in 48 houses were repaired. </p> <p>   </p>